Measure T in Chowchilla

Local Streets and Road Maintenance

The City of Chowchilla relies heavily on Measure T. Roughly 30% of the City's funding for road repairs and maintenance comes from Measure T. Measure T funds also support local transit and paratransit services.
​
Over the past 17 years, the City has used these funds for a number of critical projects:
  • 13th St. Reconstruction 
  • 15th St Signalization
  • 5th St Curve and Road 16 Reconstruction 
  • 5th Street Improvements
  • 8th St Improvements
  • 9th St Improvements
  • CATX Bus Purchase 
  • CNG Fueling Facility - City Corp Yard 
  • Colusa Ave Reconstruction 
  • Defender St Improvements
  • Fig Tree Road Improvements
  • Fuller Elementary Neighborhood Project 2017 - Complete Streets, road reconstruction, sidewalks, crosswalks
  • High School Pedestrian Improvements Phase I 
  • High School Pedestrian Improvements Phase II 
  • Howell Rd. and Gill Way Rehabilitation 
  • Humboldt Ave Street Improvement Project – Complete streets project, road reconstruction, sidewalks, crosswalks, RRFBs, storm drainage improvements. 
  • Installation of Missing Curb/Gutter (Various Locations) ​
  • Monterey Ave. Reconstruction ​​
  • Multimodal Transportation Implementation Plan (MMTIP) 
  • Orange Ave Overlay ​​
  • Overlay of the Presidential Streets 
  • Robertson & 11th St Pedestrian Improvements 
  • Roller and Hot Mix Equipment Purchase 
  • Sonoma Overlay 
  • Washington Rd Street Improvements – Measure A 
  • Washington Rd. Rehabilitation 
  • Wilson School Area Pedestrian Improvements 
  • Bus Shelter at RC Wisener Park
Picture
Picture

Future Improvements Needed

The City hopes to have Measure T funds to help 
  • SR 99/233 Interchange Project
    Expansion of existing bridge, pedestrian facilities and roundabouts at the interchange
  • SR 99 Flyover Bridge
    Construction of new flyover bridge between the interchange and Ave 24 to improve circulation over SR 99 between east and west Chowchilla
  • Chowchilla Blvd. Rehabilitation
    Rehabilitation overlay of Chowchilla Blvd.
  • Ave. 24 Reconstruction
    Reconstruction of Ave 24 at State Route 99 to Chowchilla Blvd.
  • Ave 24 1/2 Rehabilitation Project
    Ave 24 1/2 from Rd 16 to Rd 15 1/2
  • Rd 15 1/2 Rehabilitation Project
    Rd 15 1/2 from Ave 24 ½ to 15th St
  • Humboldt Ave Rehabilitation Project 
    Phase II Project - reconstruction from Front St. to 3rd St. to improve the pavement surface
  • Pedestrian Improvements
    Sidewalk infill Riverside Avenue, 8th Street, & Kings Avenue
  • Riverside Ave Rehabilitation Project
    Riverside Ave from Front St to 5th St.
  • New CATX Bus

Our Partners

Picture
Picture
Picture
Picture
Picture
Site powered by DKS Associates
  • About Measure T
  • Where did the money go?
    • City of Chowchilla
    • City of Madera
    • Madera County
  • CALENDAR
  • Annual Audits
    • MCTA Annual Audits
    • Madera County Annual Audits
    • City of Madera Annual Audits
    • City of Chowchilla Annual Audits
  • Document Library
    • Annual Work Programs
  • CONTACT